Best Practices to Achieve Zero Defects


Reading time ( words)

The following checks and balances ensure that a complex electronics build can be completed on time, on budget and with zero defects. Each practice in this process allows for adjustments or corrections to occur real time, instead of discovering them at the end of the build or worse, when it's already arrived at the end user.

1. New Product Introduction

To make your product a success, you need to ensure reliability and optimum functionality of the final product. If your company simply takes the data provided and immediately fabricates the product with no careful study of the data, materials or process, it will most likely result in faulty products and leaves you with unhappy customers. Careful review of the data before the manufacturing begins is extremely important.

2. Planning and Scheduling

The following planning and scheduling processes are essential:

  • Assembly Instructions (AI): actual detailed instructions used to assemble the product. These are generated during the New Product Introduction process.
  • Production Lot Traveler (PLT): This process is like a road map, containing the consecutive operations required to fabricate/assemble/inspect/test each item.
  • Master Schedule: The process flow is outlined in the Master Schedule for each assembly. There should be a standard production flow from Kit Pull through End Item Delivery. Each item must be defined through company work instructions, standard operating procedures, and other command media.

3. Multiple Inspections, Testing and Reporting

Inspections and testing should be multiple and strategically placed throughout the manufacturing process. Inspections that should be considered:

  • Incoming component inspections
  • FAI – First Article Inspection
  • AOI – Automated Optical Inspection
  • 4D Flying Probe
  • Other Testing such as ICT (In Circuit Test), functional and environmental testing
  • During the assembly process, problems resulting from in process and final inspections must be recorded on Inspection Defect Reports. Production reports showing yield rates, types of defects, and number of defects should also be generated.

4. QMS

All quality functions should be controlled under a Quality Management System (QMS) which is certified to ISO 9001-2015, ISO 13485 or AS9100 Standards. These systems should also be audited by outside auditors two times each year to ensure that all manufacturing processes meet the latest ISO requirements.

5. Certifications and Compliance

Certifications demonstrate the commitment to excellence of a contract manufacturer. Certifications provide a level of (objective) accountability and ensure that the contract manufacturer remains compliant with current industry standards, regulations, and best-practices which directly impact the quality and reliability of the products and services that the electronics contract manufacturer provides. The following is a list of key certifications and compliance standards that allow your company to stand out from the others.

Stephanie Weaver is a business development manager at Zentech Manufacturing. To read her article on the best practices in task order execution in contract manufacturing, which was published at the July 2018 issue of SMT007 Magazine, click here.

Share




Suggested Items

Time to Get Serious About CMMC Readiness

07/13/2022 | I-Connect007 Editorial Team
Divyash Patel of MX2 Technology is a leading cybersecurity expert who’s sounding the alarm about getting your company into a state of readiness. But he’s not yelling fire in a theater. Whether it’s aligning with DoD’s CMMC, or just ensuring your company’s data and processes are protected, Divyash can see what’s coming. “This is a must-have compliance program,” he says. “It needs to be taken seriously and maintained.”

Getting Involved Earlier in the Test Process

04/18/2022 | Andy Shaughnessy, I-Connect007
At SMTA Dallas, Andy Shaughnessy stopped by the booth for The Test Connection, to find out from Bert Horner why the company has evolved into spending more time educating and consulting with their customers when it comes to testing new designs.

KIC Adds Wave Monitoring Technology to Industry 4.0 Ecosystem for Thermal Processes

04/13/2022 | Andy Shaughnessy, I-Connect007
At the SMTA Dallas Expo, Andy Shaughnessy sat down with Miles Moreau of KIC to discuss the company’s latest offering in wave process inspection technology. Miles also explains how KIC’s early focus on automated real-time process monitoring has enabled them to become a leader in Smart factory implementation.



Copyright © 2022 I-Connect007. All rights reserved.