Murata Completes New Production Building at Yasu Division


Reading time ( words)

Murata Manufacturing Co., Ltd. has completed a new production building, which had been under construction since July 2019, on the premises of its Yasu Division. A completion was held on Tuesday, February 9, 2021.

The new production building was constructed to increase the production capacity of electrode materials in order to meet medium- to long-term increases in demand.

Share

Print


Suggested Items

Catching up With Cabletree’s Thomas Chang

09/23/2020 | Dan Beaulieu, D.B. Management Group
Dan Beaulieu has always been interested in exploring the wire harness and cable areas business, so he jumped at the chance to talk with Thomas Chang, the president and owner of Cabletree. Here, they discuss the cable assembly segment and how Cabletree serves EMS companies.

The Foundation of Industry 4.0

04/15/2020 | Oren Manor, Mentor, a Siemens business
When adopting IoT solutions, start with three main considerations. First, assess which parts of the production cycle can be automated and/or monitored most effectively with IoT devices connected to an analytics platform. IoT technology should be matched to the production cycle of your operation.

Market Insights From Epoch International’s President

02/04/2020 | Barry Matties, I-Connect007
Epoch International is an EMS company specializing in front-end engineering. Barry Matties speaks with Epoch President Foad Ghalili at productronica 2019 about the company’s ability to maintain little employee turnover, challenges they’re facing, and expected growth in the U.S. market.



Copyright © 2021 I-Connect007. All rights reserved.