GEN3 Webinar, Part 7 Released: SIR Test Coupon Design


Reading time ( words)

In this engaging, 11-part micro webinar series, topic experts Graham Naisbitt and Chris Hunt examine the history of the influences of Electrochemical Migration (ECM) and the evolving use of Surface Insulation Resistance Testing (SIR) that has been developed over the past 25 years by GEN3 and its association with the British National Physical Laboratory. GEN3 and NPL have created the standard that has now been in widespread use around the world since the turn of the millennium.  

The seventh episode, “SIR Test Coupon Design” can be viewed in under 10 minutes. Presenters discuss materials vs. process characterization, HV vs. LV influences, share the latest round robin test results and more.  

Designed to complement Gen3’s book, The Printed Circuit Assembler’s Guide to...Process Validation, this entire webinar series can be viewed in about an hour and covers a comprehensive range of topics surrounding the four groundbreaking test standards published between 2019 and 2021 that set the scene for Objective Evidence and its widespread influence throughout the world of electronics, whether in the high reliability arena of space, medical, automotive or general industrial applications.  

Visit Predicting Reliability in Electronics and start watching, free, today! 

Share




Suggested Items

Real Time with... IPC APEX EXPO 2023: Time to Design for Test

03/01/2023 | Real Time with...IPC APEX EXPO
In this RTW interview, Andy Shaughnessy and Bert Horner of The Test Connection talk about how setting up a successful circuit card plan starts with the DfT of the schematics and ends with knowledge that your CM/manufacturer has available to inspect and test your product.

Optimizing Test Engineering Practices for High-Mix Electronics Manufacturing

08/15/2022 | Mark Laing, Siemens Digital Industries Software
For PCB and assembly manufacturers, test engineering has become a critical factor in enhancing the profitability of new product introductions (NPIs). Given the trend toward high-mix, low-volume production, the journey from design data to an automated PCB testing program must be quicker and more efficient than ever before. In this article, we will discuss how to optimize the efficiency of the test engineering process in accordance with these new market realities.

Getting Involved Earlier in the Test Process

04/18/2022 | Andy Shaughnessy, I-Connect007
At SMTA Dallas, Andy Shaughnessy stopped by the booth for The Test Connection, to find out from Bert Horner why the company has evolved into spending more time educating and consulting with their customers when it comes to testing new designs.



Copyright © 2023 I-Connect007 | IPC Publishing Group Inc. All rights reserved.