Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Suggested Items

Cycle Time Reduction in a Flexible Circuit Facility

11/02/2015 | Dave Becker, All Flex Flexible Circuits LLC
Managing product flow and cycle time across a wide range of product constructions and volumes in a high-mix flexible circuit fabrication facility can be extremely challenging. What seems to work best is a tailored hybrid system, with concepts adopted from classic just in time manufacturing (JIT), theory of constraints (TOC) and quick response manufacturing (QRM).
Copyright © 2024 I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in