-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueComing to Terms With AI
In this issue, we examine the profound effect artificial intelligence and machine learning are having on manufacturing and business processes. We follow technology, innovation, and money as automation becomes the new key indicator of growth in our industry.
Box Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
Why an SLA is Central to Meeting Customer Demand
November 17, 2016 | Neil Sharp, JJS ManufacturingEstimated reading time: 4 minutes
In a simple world, an original equipment manufacturer (OEM) would take out their smartphone, hit the 'buy' button, an order would be sent immediately to their electronics manufacturing services (EMS) provider and their fully tested, configured-to-order, complex electronic or electro-mechanical product would ship out to the end user on a same day delivery.
Unfortunately, we don't live in a simple world. But that doesn't stop our service expectations increasing thanks to the likes of Amazon and other e-commerce giants. Can you imagine having to wait several weeks to get your hands on the latest gadget after you have ordered it? We now expect goods immediately and if supplier A cannot deliver we quickly look for someone else that can.
Consumers of industrial electronic products are starting to have the same expectations which presents both a challenge and opportunity for OEMs and their EMS partners. They must ensure the right products, in the right configuration, are delivered to the right place at the right time. This can create havoc if the EMS supplier is not adequately prepared – for instance they don't have enough finished stock or raw materials in the pipeline to satisfy the order. Or perhaps they don't have the resources to test and then ship products out of the door in a reduced time frame? Either way there's a real risk that the relationship between the OEM and their EMS provider could turn sour. The former doesn't get product to their exact requirements; and the latter feels that they've been put under unreasonable pressure.
So how do EMS providers overcome these obstacles in order to successfully meet the challenge of consistently delivering product to fluctuating customer demand?
The Importance of an SLA
A service level agreement (SLA) ensures that both parties are on the same page and that each is completely clear on their respective responsibilities - thereby keeping the relationship on the right track. This document, drawn up between the two sides of the partnership, contains details of service expectations, such as pricing, estimated annual usage, call off batch sizes, delivery timescales, quality and warranty.
While it is difficult to foresee all circumstances, it is vital that an EMS provider fully understands their customer's delivery expectations. If the OEM is likely to ask for fully configured tested product at the last minute or their design contains components on extended lead times, the EMS provider will need to make sure any SLA they propose is agile enough to meet such demands.
An SLA will also provide a robust framework for the OEM and their EMS partner to manage on-going stock liabilities and commitments and will outline the finished goods stocking policy. Best practice is to calculate the P:D ratio, which Blackwell Reference Online defines as: "the ratio of 'demand' time (i.e.: the time a customer must wait between asking for a product and receiving it) to the whole operation production cycle, P (i.e.: how long the operation has to manage the flow of materials and information)".
Furthermore, the SLA should detail how the EMS provider and OEM will monitor performance. What mechanisms are in place to trigger a formal review if expectations are not met? Are on-time in full delivery metrics built in and if so is there an agreed method of how these will be measured and reported?
Taking the time to draw up a thorough SLA is the best way for EMS providers to ensure they can meet customer demand on a consistent basis, even when things change at short notice.
When an SLA may not be Appropriate
An SLA brings many benefits. It provides flexibility when demand is unpredictable and, for the OEM, can help reduce finished stock liability. It is particularly useful in outsourcing relationships that involve complex supply chains, and multiple products or product variants.
However, an SLA really works best in long-term partnerships, as it requires commitment and management on both sides. Both parties will need to be in constant communication, to ensure the best outcome therefore, monthly meetings and quarterly reviews are advisable. As an OEM, it's important to take this into account before signing on the dotted line. If you have a habit of changing assembly partners every 12 months, an SLA may not be the best option for you. Similarly, if your demand is stead and predictable, you have a small product portfolio, and your customers are happy to buy to lead-time, the same may be true. Firms scheduled purchase orders also work perfectly well!
An SLA is critical to meeting fluctuating customer demand, thereby maintaining a healthy, mutually beneficial relationship between OEM and EMS provider. While not needed in all outsourcing scenarios, they can deliver many advantages. Ultimately, an SLA enables the fulfillment of the key manufacturing goal: excellent products, delivered on-time and exactly to requirements.
This article originally appeared on the JJS Manufacturing blog which can be found here.
Suggested Items
New Yorker, Major League Electronics Sign New Franchised Distribution Agreement
05/06/2024 | New Yorker Electronics Co.New Yorker Electronics, global distributor of electronic components, recently announced a new franchised distribution agreement with Major League Electronics, renowned manufacturer of interconnect products.
Tablet Shipments Show Signs of Recovery in Q1 2024
05/06/2024 | IDCAfter more than two years of decline, worldwide tablet shipments posted modest year-over-year growth of 0.5% in the first quarter of 2024 (1Q24), totaling 30.8 million units, according to preliminary data from the International Data Corporation (IDC) Worldwide Quarterly Personal Computing Device Tracker.
LQDX Divests Aluminum Soldering Business - Mina™ - to Taiyo America Inc.
05/02/2024 | PRNewswireLQDX, formerly known as Averatek Corp., developer of high-performance materials for advanced semiconductor manufacturing, today announced that it has divested its aluminum soldering business – known as MinaTM – to Taiyo America Inc., a global market leader in advanced electronic materials.
Arlon Electronic Materials Awarded Requalification to IPC-4101 QPL for All Polyimide Specification Sheets
04/29/2024 | IPCIPC's Validation Services Program has awarded Arlon Electronic Materials Division, an electronics material manufacturing company headquartered in Rancho Cucamonga, Calif., an IPC-4101 Qualified Products Listing (QPL) requalification for the third time.
Guerrilla RF Completes Strategic Acquisition of GaN Device Portfolio from Gallium Semiconductor
04/29/2024 | BUSINESS WIREGuerrilla RF, Inc. has finalized the acquisition of Gallium Semiconductor's entire portfolio of GaN power amplifiers and front-end modules. Effective April 26th, 2024, GUER acquired all previously released components as well as new cores under development at Gallium Semiconductor.