-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueComing to Terms With AI
In this issue, we examine the profound effect artificial intelligence and machine learning are having on manufacturing and business processes. We follow technology, innovation, and money as automation becomes the new key indicator of growth in our industry.
Box Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
MacroFab: Manufacturing Digitized
December 24, 2019 | Barry Matties, I-Connect007Estimated reading time: 10 minutes
One of the ways we give them that certainty is by controlling the production kit. That production kit for large jobs includes everything they need to produce, including PCBs and all the components. If there’s secondary assembly, it includes all the assembly instructions in the right language for whatever country we’re building this in, all the way to test rigs. If a customer says, “Here are my test instructions. I need a flying probe and a functional test done,” we’ll replicate those test rigs and ship them out to those factories as part of the production kit.
Matties: What about before that in the design phase?
Govshteyn: We get involved in the design stage, but primarily as an assembler. The biggest benefit people get is that they let their engineers move much faster. Imagine you’re an engineer, and you work in a large company where you have to go through your purchasing team to get prototypes built. With us, that’s not the way companies work. Their engineers have credit cards, and they let those engineers order as many prototypes as they need to. Our turn time for prototypes is about 10–14 days. We have engineers becoming self-service customers. That’s where a lot of our self-service order flow comes from, and those people become our champions into those companies. They come to the purchasing team and say, “This works really well for me for small volume. You should really consider this for production as well.”
Matties: Is your team in a physical building, or are you a virtual company?
Govshteyn: We’re a physical company. We have a factory that we run in Houston. It’s a factory that has a lot of software engineers in it. There are customer success teams, account management teams, etc. From a customer perspective, we look like a very friendly EMS provider.
Matties: How many people do you have?
Govshteyn: 55 currently.
Matties: Where are the board being produced?
Govshteyn: We have about 40 factories that we work with in North America only. This year, 80% of everything we build is going to be in the U.S.
Matties: There’s a lot of incentive now for the U.S.
Govshteyn: Lead times are driving it in that direction more than anything else right now.
Matties: How do you make your money?
Govshteyn: We primarily make money on component markup and a small cut of the labor value. What we don’t do is margin stack. When we present a job to our factories, it’s a labor-only job. We usually keep the component margin and a small piece of the labor margin, which is similar to the way Uber operates. Uber gives 80% to the drivers and keeps 20%; we do the same thing.
Matties: Are you acting as a sales agent for the EMS? Are they coming and saying, “We want to hire you to be our rep?”
Govshteyn: No, it’s a bit different. The EMS looks at us as a source of incremental revenue. They’re really dealing with MacroFab, not with customers directly, even though customers can go on the factory floor and work with them. We can arrange those visits, and those visits happen all the time.
Matties: If I’m an EMS company and you’re doing all this work, why wouldn’t I come to you and say, “I want to put you under contract, and have you fill up my house?”
Govshteyn: Here’s the way that our partners look at us: They have fixed costs and stranded costs that are already deployed. They’ve already bought all the machinery. They have people on the line. When a CFO looks at our value proposition, we’re basically incremental revenue that wouldn’t be there otherwise. If you’re asking, “Why don’t we get dis-intermediated?” we have very strong agreements with our partners. For our partners, we are a bigger source of revenue than any individual customer. There’s not an incentive to go steal our customers.
Matties: Well, it’s not a question of stealing your customers, but hiring you to represent me, so I don’t have to think about sales.
Govshteyn: Yes, maybe in the future, that’ll be the way things work. I think people want a blend of revenue. They get more margin from the jobs that they sell through their own sales teams. This is a model that works for them.
Matties: They probably have more headaches, too.
Govshteyn: Sure. I would love for people not to have salespeople anymore. But for us to be a giant sales engine for all of the manufacturing capacity in the U.S. and Mexico, I don’t think we’re ready for that yet, and I’m not sure that’s ever going to be the way it works. My impression of the way that most companies want to operate is they want to have 10 high-value customers; they don’t want to have to go look at cats and dogs. They would like the work, but they don’t want the headache associated with getting small customers in there. We’re a great channel for those smaller projects that we can aggregate, make repeatable, and take all the headaches away. Do they love their top 10 customers? Of course. But I don’t think they want to get rid of that relationship, nor do we want them to.
Matties: Thanks for sharing your story with us.
Govshteyn: Thank you.
Page 2 of 2
Suggested Items
Micron First to Ship Critical Memory for AI Data Centers
05/01/2024 | MicronMicron Technology, Inc. announced it is leading the industry by validating and shipping its high-capacity monolithic 32Gb DRAM die-based 128GB DDR5 RDIMM memory in speeds up to 5,600 MT/s on all leading server platforms.
HQ NextPCB of HQ Electronics Debut on the International Stage for Electronics Manufacture at IPC APEX 2024
05/01/2024 | PRNewswireHQ NextPCB of HQ Electronics, a leading Chinese-based multilayer PCB manufacturer and assembly house showcased its industrial prowess on the international stage for the first time at the IPC APEX Expo 2024.
GPV’s Q1 2024 Interim Financial Report Shows Strong Navigation in Uncertain Times
05/01/2024 | GPVDanish-based GPV recorded an expected drop in sales to DKK 2.3 billion for the first quarter of 2024. The decline also affected the operating profit, which was DKK 155 million compared to DKK 179 million in the same quarter last year, although the EBITDA margin was maintained. In general, demand has been softer in 2024, but GPV continues to invest for the long-term and expects the trend to turn in the second half of 2024.
The Knowledge Base: A CM’s Perspective on Box Build Practices
04/30/2024 | Mike Konrad -- Column: The Knowledge BaseIn the ever-evolving landscape of electronics manufacturing, the box-build process stands out as a critical phase that bridges the gap between individual component manufacturing and the delivery of a fully functional electronic system. This intricate procedure, encompassing the assembly of everything from PCBs to wire harnesses and mechanical enclosures, demands a high level of precision, efficiency, and innovation. As the electronics assembly industry expands and diversifies, understanding the best practices within box-build assembly has become paramount for manufacturers aiming to stay ahead in a competitive market.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
04/26/2024 | Andy Shaughnessy, Design007 MagazineIn this week’s roundup, we have a variety of articles covering everything from design through assembly, and even box build. I’ve always wondered whether box build was all it was cracked up to be. Do customers really pick one EMS provider over another because one company offers box build? And if you’ve ever wanted to volunteer, IPC’s Thought Leaders Program is looking for a few good technologists to help them on their mission. Check out Stanton Rak’s article, which was published in the spring issue of IPC Community.