Murata Completes New Production Building at Yasu Division


Reading time ( words)

Murata Manufacturing Co., Ltd. has completed a new production building, which had been under construction since July 2019, on the premises of its Yasu Division. A completion was held on Tuesday, February 9, 2021.

The new production building was constructed to increase the production capacity of electrode materials in order to meet medium- to long-term increases in demand.

Share

Print


Suggested Items

Driving Down Cost in the Supply Chain

04/08/2021 | Meghan Zou, EPOCH
Driving cost out of the supply chain goes beyond reduction of raw material cost. Though many of the manufacturers today concentrate on negotiation with their raw material supplier(s) the hidden cost of internal supply chain goes undetected. To address the cost of the entire supply chain we should not only look at direct material cost but also the cost of internal supply chain. At Epoch we looked at four areas in particular which include: planning/tracking, storage/delivery, inventory management, and supplier relationships.

Catching up With Cabletree’s Thomas Chang

09/23/2020 | Dan Beaulieu, D.B. Management Group
Dan Beaulieu has always been interested in exploring the wire harness and cable areas business, so he jumped at the chance to talk with Thomas Chang, the president and owner of Cabletree. Here, they discuss the cable assembly segment and how Cabletree serves EMS companies.

The Foundation of Industry 4.0

04/15/2020 | Oren Manor, Mentor, a Siemens business
When adopting IoT solutions, start with three main considerations. First, assess which parts of the production cycle can be automated and/or monitored most effectively with IoT devices connected to an analytics platform. IoT technology should be matched to the production cycle of your operation.



Copyright © 2021 I-Connect007. All rights reserved.