Zollner Expands China Facility


Reading time ( words)

The Zollner location in China has a new warehouse which offers more room and automated material management.

The entire property stretches across just over 3,800 square meters and also includes a parking lot with 128 spaces. The warehouse itself encompasses about 1,500 square meters, is over 10 meters high and houses eleven rows of shelves

inside. 1,650 Euro-pallets find space in the shelves. Each shelf level can carry up to 3,600 kilograms. 

High rack storage elevators are also used in the new warehouse. Using a navigation system and logistics interface with SAP Warehouse Management (SAP WM), placement into storage and picking will be automated in the future.

Share

Print


Suggested Items

A New Captive PCB Facility in the U.S.

04/19/2021 | I-Connect007 Editorial Team
Diane Maceri and Jessi Hall discuss how Schweitzer Engineering Laboratories (SEL) has been working with Alex Stepinski of GreenSource Fabrication to build their own captive PCB facility in Moscow, Idaho; the thought process behind that decision; and their involvement in the Managers Forum at IPC APEX EXPO 2021.

RTW IPC APEX EXPO: Mycronic Broadens Product Portfolio

04/26/2018 | Real Time with...IPC
Thomas Stetter, senior vice president of assembly at Mycronic, discussed with I-Connect007's Pete Starkey how their company continues to broaden their product portfolio towards a full-line SMT solution and the Industry 4.0 automated factory.

RTW IPC APEX EXPO: Thomas Scales of Saline Lectronics Discusses Internet of Things

03/09/2017 | Real Time with...IPC
Thomas Scales of Saline Lectronics speaks with Guest Editor Dick Crowe about their company's approach to offering networking and process control solutions in the automated factory.



Copyright © 2021 I-Connect007. All rights reserved.