IPC Validation Services 2014


Reading time ( words)

Guest Editor Judy Warner talks IPC's Director of Validation Services, Randy Cherry. Randy has been busy since launching IPC's Validation Services a year ago, with 16 QML audits completed and rapidly growing interest shown at this year's show. Randy also discusses future plans for auditing to IPC intellectual property standards 1071A and 1072, as well as to PCB standard 6012.

To watch the video, click here.

Share

Print


Suggested Items

Alex Stepinski: A Philosophical View

11/30/2021 | I-Connect007 Editorial Team
"My philosophy is to rely more on sensors throughout the process to measure things non-destructively, then build a model for how you’re going to perform, and just validate against the model," said Alex Stepinski. "It’s the next step slowly happening worldwide. For instance, we’ve had 2D AOI for many years. Sometimes, this is complemented with electrical tests. Now, you start to see more 3D AOI happening. You see them putting more sensors on the AOI equipment for direct measurement. Then, you also have the traditional signal integrity testing."

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

11/26/2021 | Nolan Johnson, I-Connect007
If you’re in the United States like I am, and if you celebrated with a traditional Thanksgiving dinner, like my family did, then you just might have fallen asleep sitting up in a chair (or in my case, stretched out on the couch) and missed some of the highlights in the news this week. Never fear, I woke up early to bring the top five news items you should know for this week. We have industry bookings and sales news from IPC, some news from the flex sector, an explanation of induction lamination from Happy Holden, and two different takes on “sustainability.”

New Methods for Quantifying PCB Design Weaknesses and Manufacturing Challenges

11/18/2021 | Nolan Johnson, I-Connect007
Gerry Partida explains, "The industry is at a new point in evolving how we look at building boards. Our industry has historically built boards and then tried to find a test for them. Then, when they found a test for it, they figured out that it needed to be analyzed before they built the board. We did this with electrical test. We built boards and down the road, as people started asking, “Why am I buying bad boards? We should electrically test them,” electrical test was introduced, reluctantly, into the test part of manufacturing printed circuit boards by suppliers or fabricators. Then they embraced it. But when we started testing boards, we did comparison tests."



Copyright © 2021 I-Connect007. All rights reserved.