Supply Chain in Crisis
February 8, 2019 | Nolan Johnson, I-Connect007Estimated reading time: 2 minutes
The ripples start at the very front of the process. The engineering and design teams make choices about the performance characteristics for their project, then select components that fit their performance windows.
Hundreds and even thousands of little choices must be made about which capacitor, resistor, tolerances, materials, and packages; it goes on and on and on. In a traditional design flow, the project team tends to use the parts they already know and have footprints for—maybe a little long in the tooth, but known quantities, after all.
Except these are not traditional times. Component supplies, prices, and lead times are in a great deal of turmoil. The automotive, IoT, and telecommunications sectors are vacuuming components out of the supply chain at a record pace, exerting influences like early obsolescence of older components and more.
With the design completed, the design team passes the bill of materials—including components and the fabricated board, etc.—to the procurement folks. The job is done for the design team, right? Not so fast. Some of those little component decisions—especially the ones to go with a tried-and-true, always-been-there, two-cent passive—may actually be little bombs waiting to go off in that BOM.
Procurement takes over, goes through the BOM line-by-line, and finds all sorts of parts that are no longer able to be sourced through primary suppliers. Those time-honored big-package discretes have gone end of life! Nothing in that size can be found! By the time the buyer finds something that fits the performance specifications, it’s in a 0201 package—but the BOM calls for a 0804.
Now, the procurement team sends two memos: one to the design team to identify the sourcing stalemate, and one to the product manager to tell them the new product introduction schedule is now at risk. Then, procurement makes a flurry of phone calls to try to source parts in non-primary channels, maybe even turning in desperation to grey-market sources.
The problem is even if this crisis gets resolved in procurement, the team still isn’t in the clear. As fast as component availability is changing currently, things aren’t sorted just because the project has moved into manufacturing. Those parts shortages could still arise during manufacturing or between the first and second production runs. No, it isn’t over yet. It seems like it right now, but it’s never over. The repercussions ripple up and down the supply chain at will.
To stay competitive and create long-lived products, design teams need to improve their component selections—and their design skill sets in some cases—to use the parts that will be available long term. They need to pay attention to parts availability in the short term too.
It may begin with the designers—and the designers certainly end up being held accountable to updating the design to keep the product current—but it takes the entire supply chain being in communication to keep everyone informed and in production.
To read the full version of this article, which appeared in the January 2019 issue of SMT007 Magazine, click here.
Suggested Items
I-Connect007 Editor's Choice: Five Must-Reads for the Week
01/17/2025 | Nolan Johnson, I-Connect007We’re even more committed to being your best source for industry news and tips and tricks of the trade. To that end, I’m sharing my favorite news items of the week. They range from reports on quarterly earnings to Dan Feinberg’s coverage of CES and some harsh reality from marketing expert Dan Beaulieu. If you missed it on Monday, be sure to read it again here. It’s well worth your time.
See You in Vienna: Speaker Spotlight on PEDC
01/16/2025 | I-Connect007 Editorial TeamVienna, Austria, is known for its amazing architecture, art museums, and classical music scene. But from now on, Vienna might also be known for its PCB design conference. IPC and FED have partnered to create a new PCB design conference in there. The Pan-European Electronics Design Conference (PEDC) takes place Jan. 29-30, 2025 at the NH Danube City hotel in Vienna.
RIKEN Adopts Siemens' Emulation And High-Level Synthesis Platforms for Next-Generation AI Device Research
01/16/2025 | SiemensSiemens Digital Industries Software announced today that RIKEN, a national research and development agency in Japan, is enhancing its research on next-generation AI devices with Siemens' comprehensive Veloce™
BAE Systems Awarded $85M Contract to Deliver Network Tactical Common Data Links to the U.S. Navy
01/15/2025 | BAE SystemsIn 2024, the U.S. Navy awarded BAE Systems an $85 million production contract to deliver additional Network Tactical Common Data Link (NTCDL) systems.
Electronic System Design Industry Posts $5.1 Billion in Revenue in Q3 2024
01/15/2025 | SEMIElectronic System Design (ESD) industry revenue increased 8.8% to $5,114.5 million in the third quarter of 2024 from the $4,702.4 million registered in the third quarter of 2023, the ESD Alliance, a SEMI Technology Community, announced in its latest Electronic Design Market Data (EDMD) report.