eSMART Factory Conference Program Finalized


Reading time ( words)

The eSMART Factory Conference, to be held on June 20–21, 2019 in Dearborn, Michigan, provides a forum for industry professionals across all areas to meet, network and debate the latest software systems, production strategies, and automation selection to optimize production in line with “Smart” Factory digital best practices.

The conference program is now finalized for the event, which will feature Dr. Irene J. Petrick, Senior Director of Industrial Innovation in the Internet of Things Group at Intel Corp., and Brian Toleno, Ph.D., Director of New Technology at Microsoft Corp., as keynotes speakers.

The eSMART Factory Conference will also include a tour of the Ford Rouge Factory.

Share

Print


Suggested Items

Synergy Between Smart Manufacturing and the Secure Supply Chain (Part 1)

05/29/2019 | Michael Ford, Aegis Software Corp.
As MRP and ERP functions follow computing trends and start to migrate into the cloud, a fundamental question is being raised as to whether these are still the right tools to use in today’s modern Industry 4.0 driven factory, or whether these need to evolve, be enhanced, or even replaced in order to meet the more extreme requirements of operational flexibility, as well as cope with volatile material availability in the market.

4 Ways Electronics Manufacturers are Growing Their Businesses in 2019

05/27/2019 | Neil Sharp, JJS Manufacturing
At a time when many manufacturers are struggling to remain profitable, and with the uncertainty of the Brexit negotiations still looming large, finding new ways to nurture and grow your electronics manufacturing business has never been more crucial. Yet, despite the current challenges, some EMS providers are bucking the trend with reports of sustained growth. Here is their secret.

RTW IPC APEX EXPO 2019: Manncorp Highlights Custom SMT Lines

02/22/2019 | Real Time with...IPC
Ed Stone, sales manager for Manncorp Inc., sits down with I-Connect007 Guest Editor Dan Beaulieu and discusses how they are helping customers with low- to medium-volume type production needs by installing custom SMT lines within 48 hours.



Copyright © 2019 I-Connect007. All rights reserved.