STI Offers Prototype Development


Reading time ( words)

STI Electronics, Inc., a full-service organization including engineering, contract manufacturing and training services, is a complete partner from schematic forward design through first article validation. A key step in this cycle is the prototype development process. Prototypes are a requirement in the design validation step and often consume more funding and time than initially budgeted. STI’s unique prototype development approach mitigates these expenses and reduces the overall time to market for customers’ new products. 

The typical approach to prototype development is to design, check, build and evaluate. Upon completion of the evaluation, boards are “re spun” to implement changes desired, thus adding time and money to the development cycle. STI’s approach is different with the company’s objective focused on the implementation of corrective actions via rework and repair per IPC 7711/21 (STI is an approved development center for IPC 7711/21) to get the first prototype to the customer’s desired “production” performance level. The product can be released for beta build and test once this milestone is achieved.

STI’s prototype development approach reduces the overall cost and time to market by compressing the development stages from as many as 3 cycles to as few as 1 cycle. The prototype development process is complimented by the capabilities in the company’s analytical lab. The prototype can be subjected to environmental and analytical tests as required to ensure system design objectives are met. These include but are not limited to thermal shock, vibration, humidity, etc. STI’s tests can be performed to customer-supplied specifications or a customized test plan based on best practices learned over the years. The company also has the ability to test prototypes to failure to provide feedback as to finding the weakest link in the design.

Share




Suggested Items

Assemblers Play the ‘Revise or Wait’ Game With Designers

06/22/2022 | Nolan Johnson, I-Connect007
Nolan Johnson recently spoke with Duane Benson at Milwaukee Electronics and Screaming Circuits. Duane was pointing out a trend in moving designs into production, which he termed “revise or wait.” This excerpt provides a preview of our exploration of similar topics involving supply chain issues, lead times, and proceeding forward despite the supply challenges.

How Will Emerging Chiplet Technology Affect PCBs?

06/01/2022 | I-Connect007 Editorial Team
In a recent conversation with Ventec’s Alun Morgan, the I-Connect007 Editorial Team discussed, among several topics, semiconductor packaging developments. Industry insiders will know that, when you get Happy Holden and Alun Morgan talking about emerging technology trends, there will be insights shared.

Getting Involved Earlier in the Test Process

04/18/2022 | Andy Shaughnessy, I-Connect007
At SMTA Dallas, Andy Shaughnessy stopped by the booth for The Test Connection, to find out from Bert Horner why the company has evolved into spending more time educating and consulting with their customers when it comes to testing new designs.



Copyright © 2022 I-Connect007. All rights reserved.