Isola Completes Facility Upgrades


Reading time ( words)

CHANDLER, Ariz. Isola Group, S.A.R.L., renovated its Ridgeway, S.C., facility with upgraded clean room, build-up, and automation aspects.

The multi-million dollar investment reportedly increased capacity at the location by 33%. Isola installed an Aiki automated build-up system with associated automation. The company also built a Class-1K-capable clean-room facility to house the system.

Share

Print



Copyright © 2019 I-Connect007. All rights reserved.