-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueBox Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
DEK's Shekou Facility Becomes ISO-certified
February 14, 2006 |Estimated reading time: Less than a minute
SAN JOSE, Calif. — DEK's Shekou, China manufacturing facility has obtained the ISO 9001 quality management system certification, following an independent assessment by accreditation body BSI. To achieve the certification, DEK's Shekou team fulfilled a quality policy translation, conducted a formal local review of non-conformances and customer feedback, transferred all measurement equipment into the DEK calibration db, and integrated operations into the DEK internal quality audit system.
The project was led by management representative Daniel Chang, who was supported by a team at DEK's U.K. site, which achieved the certification 12 years ago. The U.K. team included Kevin Combes, Minda Swann, and Peter Davey.
Shekou's final assessment was conducted on October 24, 2005, by two independent auditors. The audit involved a discussion with the Shekou General Manager, TK Wong, which centered on the operation of the facility and its relationship with the U.K. Having demonstrated Top Management commitment, the auditors conducted a thorough review of the system through a combination of operator interviews and the examination of supporting records.